Skip to main content
Home

Bond Project Home

Home > Bond Project > What's Happening at Schools?  
Monarch High School 
View of the front of Monarch High School 
Monarch High School
329 Campus Drive
Louisville, CO, 80027

720.561.4200
http://bvsd.org/schools/monarchhigh
Original construction date: 1998
Report Updated:  11/22/2011 
Project Details

NOTE: MUOF/athletic improvements were implemented in phase I. The rest of the project will be implemented in phase III.

Principal: Jerry Lee Anderson

Project Manager (building): Joe Gierlach
Project Manager (MUOF/athletic): Joe Gierlach

Architect (building): Larson Incitti
Architect (MUOF/athletic): Davis Partnerships

Contractor (building): Bassett and Associates
Contractor (MOUF/athletic): Golden Triangle Construction

Original Project Budget (building):  

 $2,391,162

Transfer to MOUF/athletics 

-$340,140

Transfer from Program Reserve for security measures

+$200,000

Revised Project Budget (building) 

 $2,251,022

Project Budget (MUOF/athletics, transferred from building budget):

 $340,140

Transfer from program reserve to meet scope:

+$400,869

Revised Budget:

$741,009

Project expenditures

Bond Program expenditures

 

Design Advisory Team (DAT): (Phase III)

Staff
Jerry Anderson, Principal
Mark Sibley
Reid Walker
Keith Mainland
Elaine Grace
Charlie Schoep
Rudy Sumpter
Beatrice Gerrish
Katalin Ivanyi

Parents
Mary Moon
Colleen Cimino

DAT Meeting Minutes

DAT Meeting Schedule

August 23, 3 p.m.
Sept. 13, 27; 3 p.m.
Oct. 11; 3 p.m.
Dec. 13; 3 p.m.

Contact the Monarch DAT

Design Advisory Team (MUOF/athletics):

Staff
Michele DeBerry
Mark Sibley
Phil Bravo

 

Project Timeline
 
Scheduled Milestones
u
SD (schematic design) due 10/10; Completed 10/10
uDD (design development) drawings due 12/10; Completed 12/10
uCD (construction documents) due 03/11; Completed 03/11
uBid due 04/11
uConstruction scheduled 06/11 - 01/12; Under construction
 
 

u= Design phase
u= Construction bidding
u= Construction phase

Project Status

Phase I of the bond construction project, is complete. Finished improvements include: 1) renovation of the main entry, attendance office, and main office reception area; 2) new security doors on the perimeter of the school; 3) new Instructional Technology closets to support the new additions; 4) updates to a few of the science classrooms; and 5) a new ADA ramp in the cafeteria.

Construction of the A-wing addition and the cafeteria expansion (Phase 2) will continue through the first semester. Walls and roof have been constructed on the classroom addition. Windows will be installed in the coming weeks. This portion of the project will be completed and ready for students in the second semester.

The athletic improvements were completed in phase 1 of the Bond Program.

Back to school construction update

Project photos - November 2011

A-wing classroom addition

 

 

 

 

 

 

 

 

 

 


Project photos - September 2011

 
Cafeteria expansion

 
New ADA ramp in cafeteria

 
Classroom addition

 

 
New bookstore

 

 
Main office renovations

 
Locker relocation

 
New attendance office

 

 

 
New attendance office

 

Project photos - June 2011

 
Gym wall demolition

 
Preparation for cafeteria expansion

 Error

Web Part Error: One of the properties of the Web Part has an incorrect format. Windows SharePoint Services cannot deserialize the Web Part. Check the format of the properties and try again.

Error Details:
[WebPartPageUserException: One of the properties of the Web Part has an incorrect format. Windows SharePoint Services cannot deserialize the Web Part. Check the format of the properties and try again.]
  at Microsoft.SharePoint.WebPartPages.WebPart.ParseXml(XmlReader reader, Type type, String[] links, SPWeb spWeb)
  at Microsoft.SharePoint.WebPartPages.WebPart.ParseCompressed(SPWebPartManager manager, XmlNamespaceManager xmlnsManager, Byte[] personal, Byte[] global, String[] links, Type type, SPWeb spWeb)
  at Microsoft.SharePoint.WebPartPages.BinaryWebPartSerializer.SerializedWebPart..ctor(SPWebPartManager webPartManager, XmlNamespaceManager xmlnsManager, Byte[] sharedData, Byte[] userData, String[] links, Type type, SPWeb spWeb)
  at Microsoft.SharePoint.WebPartPages.BinaryWebPartSerializer.Deserialize(SPWebPartManager webPartManager, XmlNamespaceManager xmlnsManager, Byte[] userData, Byte[] sharedData, String[] links, Type type, SPWeb spWeb)
  at Microsoft.SharePoint.WebPartPages.SPWebPartManager.CreateWebPartsFromRowSetData(Boolean onlyInitializeClosedWebParts)

[Exception: Cannot create XmlSerializers for this Web Part.]
  at Microsoft.SharePoint.WebPartPages.TypeCacheEntry.get_FailedXmlSerializer()
  at Microsoft.SharePoint.WebPartPages.TypeCacheEntry.CheckFailedEntry(XmlSerializer& xmlSerializer)
  at Microsoft.SharePoint.WebPartPages.TypeCacheEntry.get_XmlSerializer()
  at Microsoft.SharePoint.WebPartPages.WebPart.ParseXml(XmlReader reader, Type type, String[] links, SPWeb spWeb)
Scope of Work
 Facility Condition Assessment (FCA): Planned implementation (FCA): 
  •  Install additional exit signs
  • Provide proper exit signage throughout the building.
  •  Irrigation system upgrades
  • Final extent of improvements not yet determined.
  •  Repair cracking of exterior wall
  • Final extent of improvements not yet determined.
   
Program Compatibility Assessment (PCA): Planned implementation (PCA):
  • Provide additional classroom space
  • Provide six additional language art classrooms.
  • Enlarge cafeteria
  • Plans for cafeteria not yet determined.
Multi-Use Outdoor Facilities (MUOF): Planned implementation (MUOF):
  • Provide restroom facilities at the sports complex
  • Construct restroom facilities.
  • Extend utility services to the sports complex 
  • A newer sewer line is to be installed from the new restroom facilities to the existing sewer line.
  • Utilities are to be extended from the existing school to the restrooms.
  • Resurface the running track
  • The running track is to be resurfaced.
  • Possible alternate available to add a ticket booth to the restroom building.

 

  • Possible alternate available to add a storage room to the restroom building.

Information Technology (IT):

Planned implementation (IT):

  • Upgrade WAN to provide capacity to support applications with high bandwidth demands
  • Extend WAN to building, upgrade head end equipment.
  • Upgrade LANs to provide reliable and responsive access to data, research, and information
  • Upgrade existing LAN distribution.
  • Implement VoIP to enhance communications capabilities and reduce cost
  • Install new VoIP telecommunications system.